From wind tolicensed long-termgeneration.
From wind measurement to commissioning; site analysis, P50/P90 yield modelling, licensing, turbine supply and end-to-end EPC.
Wind Investment MeetingFrom wind to grid, on a single line.
From the rotor’s first turn to grid connection, we engineer every link in the chain.
Wind — the steady asset that complements solar.
Turkey has strong wind potential, especially along the Aegean, Marmara and Southeastern corridors. Licensed wind generation (WPP) offers corporate investors a predictable, long-term income stream with fixed purchase guarantees and high capacity factors — and wind, which often strengthens at night and in winter, naturally complements solar.
Led by the 61 MWp DicleRES won in the 2017 YEKA tender, Egesa manages a portfolio of more than 770 MWp across 13 licensed wind projects, from Thrace to Eastern Anatolia, taking each investment from measurement to operation. WAsP/WindPRO P50/P90 modelling, turbine layout optimisation and guaranteed O&M raise returns and lower risk.

- 01
High Capacity Factor
35–45% capacity factor on the right site — high annual yield per MW.
- 02
Hybrid Balance with Solar
Night and winter generation complements solar and smooths portfolio output.
- 03
Licensed Long-Term Income
Fixed purchase guarantee and 25+ year turbine life for predictable cash flow.
- 04
Bankable Yield
Measurement-based P50/P90 estimates provide assurance for lending and finance.
One standard, from site to grid.
One partner at every stage of a wind investment — full scope across eight areas.
Site Analysis & Wind Measurement
12–18 months of met-mast data, wind rose and turbulence analysis, site suitability assessment.
Feasibility & Yield Estimate
WAsP/WindPRO modelling, P50/P90 yield estimate, financial model and payback analysis.
Licensing & Permits
EPDK pre-licence/licence, EIA, forestry and treasury permits, TEİAŞ connection opinion and follow-up.
Turbine Selection & Layout
Onshore turbine technologies (3–6 MW), micro-siting optimisation, loss and wake analysis.
Procurement, Transport & Insurance
Tier-1 turbine supply, specialised blade and tower logistics, customs and erection insurance.
Foundations & Turbine Erection
Roads and platforms, foundations, crane erection of tower/nacelle/rotor and commissioning.
Grid Connection & Monitoring
MV/HV integration, substation, grid connection and 24/7 SCADA monitoring.
Maintenance & Operations (O&M)
Guaranteed O&M contract, preventive/corrective maintenance, performance and uptime tracking.
Wind proven in the field.
Certificates and standards
From engineering to the field, we work to international quality, environmental and safety standards.
Certification body: VIVA Technical Control and Certification — verify at vivacertificat.com
Turbines and electromechanical equipment pass international testing and independent audit.
Let’s start feasibility for your wind investment.
One partner from site analysis to commissioning. Response within two business days.
Request an Investment Meeting →About investing in wind (WPP)
What are licensed WPP and YEKA-RES?
Licensed wind farms are built to sell electricity directly to the grid; YEKA-RES projects are large-scale schemes developed through competitive tenders in state-allocated renewable energy zones. Egesa has hands-on experience in this model with the 61 MWp DicleRES won in the 2017 tender.
Why does wind measurement take 12–18 months?
At least a year of met-mast data is needed to capture seasonal variability. This data becomes a P50/P90 yield estimate via WAsP/WindPRO — a reliable, bankable basis for lenders and investors.
What is capacity factor, and why does wind complement solar?
Capacity factor is how much of installed power a plant generates over a year; on good wind sites it is 35–45%. Wind often strengthens at night and in winter — generating when solar is weak and balancing the portfolio.
Our solar solution →How long does a WPP take to build?
Including measurement and licensing, the total can span a few years; once the site is ready, construction and erection typically complete within a year. We manage the whole process with a transparent eight-step roadmap.
What is the turbine lifetime and maintenance?
Modern onshore turbines have a 25+ year design life. 24/7 SCADA monitoring, preventive and corrective maintenance and a guaranteed O&M contract ensure high uptime.
Can we combine wind with energy storage (BESS)?
Yes. A wind + battery hybrid balances variable generation, optimises peak-hour sales and can provide grid services.
Energy storage solution →Do you provide financing and feasibility support?
Yes. We support investment analysis, P50/P90-based financial modelling, financial-institution connections and loan processes.
Request a meeting →